Remodeling
What the work involves
Most bathroom failures are water finding a path nobody planned for, and they show up long after the tile went on. We build the wet areas to handle it — proper substrate, waterproofing behind the tile, moisture-resistant board — and then make it look the way you wanted.
- Full gut and rebuild, or a targeted refresh
- Shower pans, waterproofing and moisture-resistant substrate
- Tile, including large-format and recessed niches
- Vanity, fixture and shower glass installation
- Coordination with plumbing rough-in
What actually fails, and when
A bathroom rarely fails at the surface. It fails behind it — at a shower pan that was not sloped to the drain, at a corner where the waterproofing membrane stopped short, at a niche cut into a wall without the substrate being detailed first. Tile and grout are not waterproof and were never meant to be; they are a wearing surface over a system that is.
None of this is visible on the day it is finished. It shows up a year or three later as a soft spot in the floor outside the shower, or a stain on the ceiling below. By then the fix is the whole room again.
Building the wet areas to handle it
Wet areas get moisture-resistant substrate rather than standard board, a waterproofing membrane behind the tile, and a pan sloped properly to the drain. Niches and benches get detailed as part of the waterproofing rather than cut in afterwards. Changes of plane — floor to wall, wall to ceiling — get treated as the joints they are.
It is unglamorous work that nobody photographs, and it is the whole difference between a bathroom that lasts and one that looks finished.
Ventilation, and where it goes
A South Florida bathroom needs a working exhaust fan, and it needs to discharge outside the building. A fan that dumps into the attic is moving the moisture problem rather than solving it, and in this climate an attic is the worst place to put it.
Slab-on-grade construction shapes the plumbing too. There are no basements here, so drain lines run in or under the slab — which means moving a toilet or a shower drain is concrete work, not a morning with a saw. It is worth knowing that before the layout is settled.
Questions
Common questions
Can the toilet or shower be moved?
Usually, but it is a bigger job than it looks. Drain lines sit in the slab, so relocating a fixture means opening concrete, re-routing to maintain fall, and closing it back up. Moving a vanity a couple of feet is often straightforward; moving a toilet across the room is a different project. We tell you which one you are looking at before you commit to a layout.
How long does a bathroom remodel take?
A full gut and rebuild is a multi-week job with unavoidable waiting built in — waterproofing has to cure, thinset has to set, and rushing either is how you get a callback. If it is your only bathroom, say so early; the sequencing and staging can be planned around it.
Do you waterproof behind the tile, or just use the backer board?
Both. Moisture-resistant board is a substrate, not a waterproofing layer. Wet areas get a proper membrane over the substrate as a separate step, which is what the manufacturer's warranty on the tile system assumes was done.
Related
Also on the job
Let's build together
Ready to get started?
Send us the drawings, or just tell us what you are trying to do. We will walk the job and come back with a written, line-item price.
- People
- Projects
- Progress