A kitchen touches nearly every trade in the house. Running them in the right order is most of the job.

Remodeling

What the work involves

A kitchen touches nearly every trade in the house — framing, electrical, plumbing, tile, cabinetry and paint all have to land in the right order and none of them can start early. Running that sequence is most of the job, and it is the difference between a kitchen that is out of service for three weeks and one that is out of service for three months.

  • Demolition and haul-away
  • Layout changes, including removing non-load-bearing walls
  • Cabinet and countertop installation
  • Coordination with electrical and plumbing rough-in
  • Tile, backsplash and finish carpentry

The sequence is the job

Framing, electrical, plumbing, tile, cabinetry and paint all have to land in a particular order, and none of them can start early. Cabinets cannot go in before the floor is flat. Tile cannot go up before the rough-in is inspected. Counters cannot be templated until the cabinets are set and level.

Get the order wrong and the work does not just take longer — it gets done twice. That is the difference between a kitchen out of service for three weeks and one out of service for three months, and it is decided on paper before anybody picks up a tool.

Moving a wall is not always possible

Most South Florida houses are concrete block — CBS, for concrete block and stucco. That changes the conversation about opening up a kitchen, because a block wall is usually doing structural work and cannot simply come out. Removing or opening one means a beam, a load path and an engineer's drawing, and it is a permit item.

Interior partitions in newer construction are more often light-gauge steel or wood stud, and those come out easily. The first thing worth establishing on a layout change is which kind of wall you are actually looking at, because the answer is the difference between an afternoon and a structural permit.

Humidity is a design input here

Kitchens in this climate run humid, and cabinetry notices. Solid wood doors move seasonally, MDF swells if water reaches an unsealed edge, and a toe kick that sat in standing water once will tell you about it for years.

It is worth deciding early where moisture-tolerant materials are worth the money and where they are not — under the sink and along the dishwasher run almost always, on an upper door almost never.

Questions

Common questions

Do I need a permit to remodel a kitchen in Miami-Dade?

Usually yes. Cosmetic work like replacing cabinet doors or repainting generally does not require one, but anything touching electrical, plumbing, gas or a wall does. Moving a sink, adding circuits or opening up a wall are all permit items, and the inspections that follow are what make the work legal when you sell. We handle the permit conversation as part of the job rather than leaving it with you.

How long is my kitchen out of service?

It depends far more on scope and on how the trades are sequenced than on crew size. A refresh that keeps the existing layout is a different project from one that moves plumbing. We give you a written schedule with the bid so you can plan around it, and the honest answer is that the long pole is usually cabinet lead time, not labour.

Can you work with cabinets I have already bought?

Yes. Tell us before we quote, because the cabinet spec drives the layout, the blocking and often the electrical. If the boxes are already on site or on order, we build to what you have.