Get a Quote

Home Services Taping and Finishing

Drywall Taping & Finishing

Framing and board are judged by the finish on top of them. This is the part everybody sees.

Framing & Drywall

What the work involves

Framing and board are judged by the finish on top of them. We tape, bed and finish to the level the space calls for, and where critical lighting is going to rake across a wall we skim it to Level 5, because that lighting will find every joint that was called good enough.

  • Level 3, 4 and 5 finishes
  • Full skim coat for gloss paint and critical lighting
  • Corner bead, reveals and trim details
  • Sanding with dust control on occupied sites
  • Punch list and touch-up before handover

Levels are a specification, not an opinion

Drywall finish levels are defined in an industry standard, and they mean specific things. Level 3 suits heavy texture. Level 4 is the common default for flat paint and light texture. Level 5 adds a skim coat over the entire surface and is what you want under gloss or semi-gloss paint, under dark colours, and anywhere critical light will rake across a wall.

Specifying Level 4 and then painting it in a satin dark grey opposite a wall of glass is how a job ends in an argument. The level should be chosen from the paint and the lighting, and written into the scope before anybody starts.

South Florida has a lot of glass

Critical lighting is the finisher's enemy, and this is a region built around large sliding doors and full-height windows. Low-angle daylight across a long wall finds every joint, every fastener and every ridge that was called good enough.

If a wall is going to live in that light, it is worth skimming. It costs more once and it is the only chance to get it right, because the alternative is discovering the problem after the paint is on.

Dry times are not negotiable here

Joint compound dries by evaporation, and humidity slows evaporation down. A coat that would be ready overnight in a dry climate can still be damp in the morning in August in Miami. Coating over compound that has not dried is how you get shrinkage cracks, bubbled tape and a finish that moves after the painter has gone.

That is a scheduling reality rather than a technique, and building it into the programme honestly is better than compressing it and paying for the compression later.

Questions

Common questions

What finish level do I need?

It depends on the paint sheen and the light. Flat paint on an interior wall is usually fine at Level 4. Gloss, semi-gloss, dark colours, or any wall that a window rakes light across should be Level 5. If you are not sure, tell us the paint and show us the room — that question is answerable at the walk-through.

Do you control dust when sanding?

Yes. Occupied sites get dust control as part of the scope — containment, vacuum sanding where appropriate, and protection of what is staying. It is slower than sanding dry and open, and it is the difference between a client who can use the rest of the building and one who cannot.

Do you prime, or does the painter?

We hand over prime-ready unless priming is written into our scope. If you want us to prime — and on a Level 5 there is a good argument for it, because primer is what reveals anything still needing attention — say so and it goes in the bid.

Let's build together

Ready to get started?

Send us the drawings, or just tell us what you are trying to do. We will walk the job and come back with a written, line-item price.

  1. People
  2. Projects
  3. Progress